Back to Squawk list
  • 15

Anchorage's North-South runway open atfer2 years of work

تم الإرسال
 
Two years of construction sent all of Anchorage International Airport's departing air traffic over the city's residential neighborhoods. All of that is completed as of 10/1/19. (www.ktva.com) المزيد...

Sort type: [Top] [Newest]


picturetaker
Christian Parada 0
If it took them 2 years to improve a runway I wonder how long it would take them to upgrade an airport terminal?
linbb
linbb 0
Are you some sort of construction engineer? Or know all the problems which may have been encountered due to where its located? If not move on
picturetaker
Christian Parada 1
You can tell other people what to do when you sign their paycheck.

تسجيل الدخول

ليس لديك حساب؟ سجل الآن (مجانا) لتستمع بمميزات مخصصة، وتنبيهات الرحلات، وغير ذلك الكثير!
هل علمت بأن خاصية تتبع الرحلة التابعة لـFlightAware مدعومة بواسطة الإعلانات؟
يمكنك مساعدتنا بالإبقاء على موقع FlightAware مجاني بدون مقابل من خلال السماح بالإعلانات من موقع FlightAware.com. نحن نعمل بكل كد لجعل إعلاناتنا ملائمة ومناسبة وأن تكون هذه الإعلانات غير ملحوظة من أجل إنشاء تجربة رائعة. يمكن بكل سرعة وسهولة السماح لـإعلانات القائمة البيضاء الموجودة على FlightAware، أو الرجاء مراجعة الحسابات المميزة الخاصة بنا.
استبعد