1 عدد الأصوات (3.00 المتوسط) و 3,905 عدد المشاهدات  

N7878 — - 1-29-2011 Boeing Dreamliner (testing) 787-8, N787BA, ZA001 landing at Paine Field, Everett, Washington  ||||  Notice the 3 Dreamlifters in the background parked in front of the Boeing Paint hangars.   Also note the 3 ANA 787s INVENTORY lined up on the Boeing ramp -- all in test mode -- prior to FAA certification.  At this point in time, the 787 is scheduled for delivery in August, 2011. ||||  Photo by Bruce McKinnon
/images/icons/csMagGlass.png حجم متوسط / حجم كبير / الحجم الكامل

N7878 —

تم الإرسال

1-29-2011 Boeing Dreamliner (testing) 787-8, N787BA, ZA001 landing at Paine Field, Everett, Washington |||| Notice the 3 Dreamlifters in the background parked in front of the Boeing Paint hangars. Also note the 3 ANA 787's INVENTORY lined up on the Boeing ramp -- all in test mode -- prior to FAA certification. At this point in time, the 787 is scheduled for delivery in August, 2011. |||| Photo by Bruce McKinnon

Comments

Please log in or register to post a comment.

سجل النشاط
هل تريد البحث عن التاريخ الكامل لـ N7878 والذي يعود إلى عام 1998؟ اشتر الآن، واحصل عليه في غضون ساعة واحدة.
التاريخ الطائرة نقطة الانطلاق الوجهة مغادرة وصول المدة
No Recent History Data
يُتاح للمستخدمين الرئيسيين (التسجيل كمستخدم رئيسي يتم بشكل مجاني وسهل!) عرض 3 months من المحفوظات. انضم إلينا
 

تسجيل الدخول

ليس لديك حساب؟ سجل الآن (مجانا) لتستمع بمميزات مخصصة، وتنبيهات الرحلات، وغير ذلك الكثير!